Final drive
I have found results from200000+products and80000+suppliers aboutFinal drive
Mini Excavator Driver 331d 6670667 Travel Motor 331 Final Drive for Bobcat Construction Machinery Parts
21n-27-00190 Final Drive for Komat Su Excavator PC1250-8
Factory Price Komatsu PC20-7 PC28uu PC50 PC50uu2 pH250n41 Final Drive, Komatsu PC30 PC40 PC60 PC60-7 Drive Travel Motor
Final Drive Used for Hydraulic Crawler Excavator Hitachi Ex200
Sem 816 816D 822 822D 824 F826f 832f Bulldozer Final Drive
High-Quality Final Drive Assembly for Hyundai Excavators R305 R330
99481640 PC3000-1 Excavator Final Drive Assembly Travel Gearbox PC3000-6 Drive Gear Box
Kyb (KAYABA) Bonfiglioli Rexroth NACHI Travel Motor Final Drive for Excavator
Travel Motor Final Drive Mag85vp-1800 for Sh120 E311 E312 E312b E312c E312D
San'y Excavator Final Drive Unit 12940338 Travel Motor Gearbox Suitable for Sy305c
Komat'su Excavator PC200-7 PC200-8 Hydraulic Piston Travel Motor Final Drive
Kayaba Kyb Travel Motor Original Kyb Final Drive Mag-230vp
Good Price Mantall 2 Bare Pacing China Wheel Loader Part Final Drive Self-Propelled Xe140W
171-9329 452-6208 1719329 4526208 Final Drive for 307D 307e Excavator
Original New Mini Excavator Parts, Vio60 Travel Motor Assy /Final Drive for Yan/Mar, Kyb Type
R210-7 Travel Motor Gearbox 31n6-40051bg 31n6-40060bg 31n-640010 Final Drive for R210LC R210-7 R220-7 Excavator Parts
R220LC-9s 39q7-40100 R220-9 R225-9 R215-9 R210-9 R260-9 R210LC-7 Final Drive for Hyund*Ai Excavator Parts
10-13ton Jeil 14TM Doosan TM18vc Hydraulic Travel Motor Final Drive for Sumitomo Sh120 Excavator
Excavator Parts 329 320 323 Final Drive Assembly 6689642 6686158 Travel Motor
227-6188 / 2276188 Travel Motor Final Drive Assembly for C at 365c Ca T374D Excavator
Gft 36 T3 3228 Rexroth Planetary Gearbox for Crucher Final Drive
Original Travel Motor Assy 511-0315 Final Drive for Excavator E336 336D2
Wsg Excavator Ex1200-6 Final Drive Ex1200 Travel Device Assembly 9279168 9301480 4688059
Brand Original 21t-27-00410 Final Drive for Komatsu PC2000-8 Excavator Heavy Equipment Parts
Sourcing guidance for Final Drive
What are the key technical specifications to evaluate when sourcing a final drive?
When selecting a final drive, you must prioritize torque density and gear reduction ratios to ensure the unit matches the machine's hydraulic output. Key specs include the displacement (cc/rev), maximum operating pressure (typically 30-35 MPa), and output torque. Ensure the mounting dimensions (flange diameter and bolt hole patterns) are 100% compatible with your specific excavator or crawler model to avoid costly installation failures.
How can I verify the quality and durability of the internal components?
The longevity of a final drive depends on the heat treatment process of the planetary gears and the quality of the floating seals. Request suppliers to provide evidence of induction hardening or carburizing for gears to ensure a surface hardness of HRC 58-62. Additionally, verify that the unit uses high-grade bearings (such as NSK or SKF) and high-pressure resistant oil seals to prevent leakage and premature wear in harsh environments.
What compliance standards and certifications should a professional supplier possess?
Reliable manufacturers should hold ISO 9001:2015 certification for quality management systems. For hydraulic components, look for compliance with CE marking (for the European market) and evidence of rigorous factory testing, including 100% hydraulic leakage tests and noise level testing (typically <80dB) before shipment. Suppliers on Made-in-China.com with 'Audited Supplier' status provide an extra layer of verification regarding their production capabilities.
What are the common usage scenarios and maintenance requirements for final drives?
Final drives are critical for tracked construction machinery like excavators, bulldozers, and drill rigs. To ensure a service life of 5,000+ hours, buyers must emphasize regular gear oil changes (every 500-1,000 hours) and the use of high-viscosity extreme pressure (EP) lubricants. Advise end-users to check for metal shavings in the magnetic plug, which serves as an early warning sign of internal gear fatigue.
Cross-Border Procurement Risks and Strategic Advice
How can I mitigate the risk of receiving a final drive that doesn't fit my machine?
The most common risk is dimensional mismatch. Always provide the supplier with the machine model, part number, and the number of frame/sprocket bolt holes. Request a technical drawing (PDF or CAD) for approval before production. For customized OEM orders, a sample trial is highly recommended to verify hydraulic port alignment and travel speed synchronization.
What are the best practices for negotiating price and lead times with Chinese suppliers?
Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranties (12-24 months) instead of small price cuts, as this proves the supplier's confidence in their product. For bulk orders, aim for a 10-15% discount at the 10-unit tier. Ensure the contract specifies a lead time (usually 7-15 days for stock items) with clear penalties for delays to protect your supply chain.
How should final drives be packaged and shipped to ensure safe arrival?
Final drives are heavy, high-precision hydraulic components. They must be shipped in fumigated wooden crates with internal shock-absorbing foam and anti-rust VCI bags. Since these units contain residual oil, ensure the supplier provides a Non-Hazardous Chemical Declaration to avoid customs delays. For international shipping, FOB or CIF terms are standard; however, ensure the cargo is insured for its full replacement value.
How can I ensure transaction security when dealing with overseas suppliers?
Utilize secure payment methods and prioritize suppliers on Made-in-China.com who offer Star Ratings and comprehensive audit reports. Always conduct a pre-shipment inspection (PSI)—either via a third-party agency or by requesting a video of the unit undergoing a pressure test with your specific serial number visible—to ensure the product meets the agreed-upon performance benchmarks before final payment.





























